翻訳と辞書
Words near each other
・ Farm to Market Road 350
・ Farm to Market Road 3504
・ Farm to Market Road 3506
・ Farm to Market Road 3537
・ Farm to Market Road 3540
・ Farm to Market Road 3541
・ Farm to Market Road 359
・ Farm to Market Road 360
・ Farm to Market Road 361
・ Farm to Market Road 363
・ Farm to Market Road 373
・ Farm to Market Road 374
・ Farm to Market Road 4
・ Farm to Market Road 400
・ Farm to Market Road 407
Farm to Market Road 423
・ Farm to Market Road 442
・ Farm to Market Road 449
・ Farm to Market Road 455
・ Farm to Market Road 457
・ Farm to Market Road 458
・ Farm to Market Road 464
・ Farm to Market Road 465
・ Farm to Market Road 466
・ Farm to Market Road 471
・ Farm to Market Road 487
・ Farm to Market Road 50
・ Farm to Market Road 511
・ Farm to Market Road 526
・ Farm to Market Road 527


Dictionary Lists
翻訳と辞書 辞書検索 [ 開発暫定版 ]
スポンサード リンク

Farm to Market Road 423 : ウィキペディア英語版
Farm to Market Road 423

Farm to Market Road 423 (FM 423) is a farm to market road in Denton County, Texas.〔
==Route description==
FM 423 is major north–south arterial through the cities of The Colony, Frisco, and Little Elm, providing access to area highways for both existing residences and new subdivisions being developed in central Denton County. The route begins at (the mainlanes of which are the Sam Rayburn Tollway) in The Colony. The route travels north through The Colony, where it is known locally as Main Street, and into Frisco. It briefly skirts the eastern edge of Little Elm before reentering Frisco and ending at .〔
Due to rapid growth during the late 1990s and early 2000s, plans were made to widen FM 423 into a six (6) to eight (8) lane thoroughfare. FM 423 will be widened to eight (8) lanes between SH121/Sam Rayburn Tollway and Ridgepointe Drive, and widened to six (6) lanes from Ridgepoint Drive north to SH380, approximately 11 miles. The new road will include auxiliary Left and Right Turn lanes, a new signal light at Lake Highlands Drive, and sound barrier walls in specific locations. Construction from the northern city limit of The Colony north to is complete as of June 2013.
The roadway construction contract was conditionally approved by TxDOT in September 2011. The construction is scheduled to start mid to late 2013 after the private utilities have completed relocation. The project’s anticipated completion date is June 2016.〔http://www.ci.the-colony.tx.us/Resident/RoadRepairs.html#MainStreetWidening〕